Public Works Department

Town Roads, Right of Way & Ditches

Town of Greenville Street Index Map


a road in Greenville, WI

2010 Road Work

(work and schedules are subject to change at any time)

2010 Crack Sealing Map

2010 Micro-Surfacing Map

2010 Overlay Schedule

 

The Proposed Schedules are as follows:

  • Crackfilling Work:
  • Micro-Surfacing Work:
  • Overlay Work: Starting Tuesday June 1, 2010

All preliminary work (crackfilling and spray patching) must be completed on roads before micro-surfacing can take place. These schedules are tentative relying heavily on weather. If you have any questions please feel free to contact the Public Works Dept. at (920) 757-7276.

 

Weight Limits Ordinance - Weight limits are administered to help protect the Town roads when they are susceptible to damage. They are used in spring and in other special situations where the roads can only hold a certain amount of weight.

Weight Limit Permits (sample) can be obtained at the Greenville Public Works Building (located behind the Fire Station) between the hours of 7:30am – 4:00pm Monday through Friday except on holidays. These will be filled out in the office and needs to be hung from the rearview mirror of the vehicle doing the transporting.

 

Drainage Ditches — To fill the ditch in your yard, you need to purchase the proper permit from the Public Works Department.  Anyone not obtaining a permit will be required to put the ditch back to it's original state at the property owners cost. 

- Piping/Filling in of Roadside Ditches Policy

- Ditch Filling Checklist

- Ditch Filling Permit Example

 

Mailbox Installation Requirements

Utility Service Permit Application

Utility Service Fee Schedule